Scope of work:
Installed underground electrical and communications conduits and pit system.
Installation of all electrical wiring, including incoming consumer mains with new Main Switchboard/Meter Panel plus new main sub board.
Installed emergency lighting system with test facilities.
Installed new Fibre Optic loop from main Communication Rack to new Gym Communication Rack. Installed internal data cabling, terminations and testing.
Provided industry standard Maintenance Manuals and 12 month warranty period on installation and materials