TAFE BUILDING 1

PROJECTS / TAFE BUILDING 1

Scope of work:

Provided demolition of all existing wiring to allow for new power, lighting and data systems.

Design and constructed cable tray with seismic restraints and lighting track system throughout the New Trade Learning Centre.

Installed 2 x new sub boards and new sub mains.

Installed power and lighting circuits throughout, with area emergency stop control safety system to provide power isolation.

Installed emergency lighting system with test facilities.

Installed internal data cabling, terminations and testing.

Provided industry standard Maintenance Manuals and 12 month warranty period on installation and materials.